Lot Inspection
140 – Pre Clearing
Plumbing
200 – First Rough
202 - Second Rough
208 – Plumbing Final
Foundation
250 - Monolithic Slab
251 - Footing
252 – Stem Wall Footing
254 – Second Floor Slab
255- Tilt Wall
257 – Sidewalk
258 – Patio
260 – Retaining Wall Footing
Block/Lintel/ Tie Beam
262 – Down Cell
264 – Lath/Brick/Flashing
300 – Lintel
302 – Tie Beam
306 – Retaining Wall
308 - Column
312 – Rake Beam
314 – Grade Beam
Framing
350 – All Rough
351 – Framing
352 – Exterior Wall Sheathing
/ Shear Wall
353 – Firewall Framing
(duplex)
354 – Roof Sheathing Braces/ Ties/ Down Cell
355 – Above Ceiling
358 – Exterior Strap
Mechanical
400 – HVAC Rough
410 - HVAC Final
430 – Hood Duct Rough
Electrical
450 – Underground Electrical
452 – 2nd Rough
454 – Temporary Pole
455 – Electric Feeder
456 – Early Power
458 – Commercial pre-power
460 – Electrical Final
Insulation
500 – Insulation
Gas Piping
650 – Gas Rough
652 – Gas Final
Pools
700 – Pool steel & ground
702 – Deck
703 – Elec & Alarm
705 – Pool final
Seawall
140 – Seawall pre-clearing
153 – Turbidity barrier
849 – Seawall deadman/cap
995 – Seawall landscape final
Miscellaneous
801 - Storefront
803 – Final inspection
852 – Elevator pit
853 – Irrigation Final
854 – Screen Enclosure Final
856 – Roof final
860 – Demolition final
861 – Pre-driveway
862 – Driveway Final
863 – Pavement Damage
963 – Barrier Final
951 – Drainage Final
Final Inspections
984 – Stormwater
985 – Engineering
986 – Traffic Engineer
993 – Utility Comm.
994 – Utility Final
995 – Landscape
998 – Fire
999 – Final Building